Domestic Wind Turbines

Good news for wind turbine owners - Faster payback times with double ROCs

Energy Efficiency for Schools - a practical guide to making your School greener 

Instant savings when you switch your old fluorescent tubes to the award winning 8to5 Energy Saver - approx 1 year payback

Carbon Trust Interest Free Loans for SME's - Find out if your business qualifies for an interest free loan.

 

 

 

Ewind 2.5KW Wind Turbine

This powerful yet small 2.5kw downwind turbine is designed to withstand winds of up to 65m/sec (145mph).

2.5 KW Wind Turbine - Ewind  

This new design 2.5KW wind turbine utilises the very latest in blade design and intelligent computerised controls in order to optimise the turbine’s power productivity.  Real time wind speed, voltage and the current produced is recorded for performance checks. 

  • Performs better than many of the antiquated 3KW machines in the current market.
  • 5 year Manufacturer's Guarantee
  • Low start up windspeed

 

Axial Flux Generator

Most iron core generators suffer from a cogging effect – the turbine start up is lumpy, and this prevents a smooth start up at low wind speeds. This wind turbine uses an air core generator, providing a smooth startup even in very low wind conditions.

Low Voltage Startup

The inverter provided with this turbine operates over a wider range than conventional inverters (from 50 - 80v), meaning that even at very low windspeeds power is still being generated.

Multi Power Point Inverter

16 programmable power points enable the optimisation of the power output over the entire working range of the turbine. The inverter also has a computer interface for monitoring if required and is EN50438 Compliant.

Maintenance Free

The generator of this turbine is sealed and is greased for its lifetime. The only inspection and maintenance that is required is to inspect the blades after five years and change after ten years.

Price and Guarantee

Typically a full Grid-Tied tied installation costs in the region of £12,500, with a five-year manufacturers guarantee. This price includes the turbine complete with an 11.5m free-standing Galvanised Tower, Grid-Tie Inverter, Controller and all cabling required.

The foundation base preparation costs in the region of £1,100 inclusive of labour and materials.

Contact Us to enquire about this wind turbine.

 

 Wind Turbine News

Renewable Energy Obligation - ("ROC") Information and latest news concerning the industry.

Good news for wind turbine owners - Faster payback times with double ROCs.

10KW Wind Turbine ideal for use on farms, rural premises and smallholdings. A visually appealing and industry proven wind turbine producing around 11 - 13,000 KW hours per annum.

Medium Wind Turbines - 10 KW

Wind industry ready to pump £2.5bn direct into UK economy.

Wind turbine grants for farms in Yorkshire - Yorkshire Forward Wind Turbine Funding Scheme

 
 
Ewind.co.uk - Empowering Wind 2009 © Copyright - All Rights Reserved